Schedule

← All Topics

Steps for scheduling.

Give the required selection screen parameters (Date if blank, sy-datum will be taken internally )

Select the scheduling checkbox as checked.

Save the variant using the save button available.

Save the variant.

Goto Utilities -> select Schedule Background.

Select the variant and schedule.

The program will get scheduled in the background based on the periodicity given in the scheduling.